Carbones del Cerrejón

IPCC for three open cast mines

Project Description

Situation:

  • Fleet exceeds 230 trucks
  • Long haulage distances
  • Increasing pit depth

Scope of Pre-feasibility Study:

  • Investigation of IPCC variants
  • Preparation of mine and dump layouts integrating IPCC into current mining operation
  • Economic modeling

Project Details

  • ClientCarbones del Cerrejón
  • Date 2010
  • Region South America

Related Projects

Back to Top